Modernes Gebäude mit Wego Systembaustoffen, nachhaltige Bauweise, innovative Baustoffe, Architektur,.

Customs Academy Rostock

Europe's largest modular timber construction project, almost 1,000 modules, and a construction site full of challenges: The new construction of the Customs Academy in Rostock required precise coordination down to the smallest detail. The large number of small rooms and the sheer scale of the construction site, in particular, made the project a real challenge for all involved.
Hochwertige Baustoffe für moderne Systembaustoffe bei Wego in Deutschland.
© 2025 Christian Hoffmann (SBL-MV / Ministry of Finance and Digitalization MV)

Project Overview:

Building the Future with Modular Timber Construction: The new Customs Academy in Rostock, built on a 32,500 m² plot, is not only one of the largest federal construction projects but also one of Europe’s largest modular timber construction projects. For us as a building materials trade company, this project primarily meant one thing: maximum coordination, reliable material supply, and quick responsiveness on the construction site.

The complex comprises two seven-story residential buildings and a modern teaching building including a cafeteria.

Approximately 1,000 timber modules were installed within just two years.

Architecture & Use: Functionality Meets Quality of Stay

The buildings combine sophisticated architecture with a well-thought-out room structure. Inside, versatile areas for study and daily life were created:

  • Common and leisure areas
  • Study rooms and library
  • Modern lecture halls
  • Spacious auditorium with innovative acoustics, lighting, and timber architecture


The campus was already put into operation in spring 2026: The first 150 students and approximately 70 lecturers started in the new premises. In total, the facility offers capacity for up to 600 students.

Challenge of a Major Project: Precision in Detail

The dimension of the project presented particular challenges to all involved. In particular, the multitude of small, functionally different rooms in the residential buildings required precise planning and coordination down to the smallest detail.

In a project of this magnitude, short-term adjustments to the construction process are almost unavoidable. The key then is to be able to react quickly – with available materials, short communication channels, and flexible logistics.

Together with our customers, we ensured that necessary adjustments could be implemented without major delays and that construction processes remained stable.

Moderner Gebäudekomplex mit Holzfassade und großen Fenstern, Baustoffe für Systembau.
Innenansicht moderner Bürogebäude mit innovativen Baustoffen und nachhaltiger Architektur.

Products Supplied:

Overall, we supplied a variety of products for the project:

Screed Systems:
CEMEX, Fischer Cyclepor, Knauf Insulation, Chemotechnik, Gefinex

Drywall & Acoustics:
Siniat, Promat, Agepan, Knauf Gips, Richter, wegopower, Climowool, Tektalan/Heraklith

Technical Insulation Materials:
Isover, Rockwool, Paroc, Sebald

An important component was also the use of our Thermoblower, which enabled leveling fills for the different rooms.

Conclusion: A Milestone with a Signal Effect

The Customs Academy Rostock is rightly referred to as a milestone in new construction. The project impressively demonstrates how modern construction with timber modules, well-thought-out planning, and strong partnership in the building materials trade can be successfully implemented.

Further references

Historisches Gebäude mit moderner Eingangsanlage, Baustoffe für Systembau.

Archdiocese of Paderborn

Gerhard Gieseke Bau- & Möbeltischlerei GmbH from Lichtenau supported a prestigious project on behalf of the Archdiocese of Paderborn: The Liborianum, an education and guest house in the former Capuchin monastery, was extensively renovated and modernised. This is where wego vti came into play with selected, high-quality building materials.

Moderne Veranstaltungshalle mit festlich gedeckten Tischen und Bühnenpräsentation, ideal für Events.

Alando Ballhaus Osnabrück

During the renovation of the Alando Ballhaus event hall in Osnabrück, great emphasis was placed on good acoustics. To ensure the visual appearance was not neglected, the sound-absorbing panels installed on the ceiling were designed to look like wood. wego vti was commissioned to procure and deliver the custom-made product.

Blick auf moderne Hochhäuser und Wolkenkratzer in urbaner Skyline, Architektur und Stadtentwicklung.

Grand Tower Frankfurt

Frankfurt’s skyline has gained a new addition: the Grand Tower is the tallest residential building ever built in Germany. The 180-metre-high skyscraper, which has noticeably changed the cityscape of Frankfurt am Main, is almost 30 metres taller than the Colonia-Haus in Cologne. Wego/Vti played a key role in the construction of the Grand Tower.

Don’t miss a thing. With our newsletter.

Stay up to date and regularly receive great tips for the construction site, interesting news from the construction industry, as well as early announcements of new products and special offers. No blah blah—just useful content for professionals.